Filter Projects

Agency: Ministry of Environment, Climate Change and Technology

Island / Atoll / City
Category
Atoll
Island
Tags
Reset
Total Projects: 55
Agency:
Ministry of Environment, Climate Change and Technology
Agency:
Ministry of Environment, Climate Change and Technology
Agency:
Ministry of Environment, Climate Change and Technology
Agency:
Ministry of Environment, Climate Change and Technology
Agency:
Ministry of Environment, Climate Change and Technology
Agency:
Ministry of Environment, Climate Change and Technology
Agency:
Ministry of Environment, Climate Change and Technology
Agency:
Ministry of Environment, Climate Change and Technology
Agency:
Ministry of Environment, Climate Change and Technology
Status Details:
Completed.
Agency:
Ministry of Environment, Climate Change and Technology
Status Details:
"Waste to Energy facility contracted - Design approved, mechanical running test for the steam turbine done Plant shipped on 4th Dec 2020 and arrived on 20th Dec 2020 Site handover date 1st May 2021 Site Mobilization - 1st July 2021 Plant 2nd shipment arriving 24th July 2021 Completed installation of temporary boundary fence(South, West, and North side – East side remains) Completed soil excavation for equipment foundation" Equipment foundations 90% complete All remaining parts of the plant arrived in a chartered vessel to Hithadhoo port and were transferred to the project site
Agency:
Ministry of Environment, Climate Change and Technology
Status Details:
This project aims to establish a sustainable solid waste management system in the islands of Zone 3- AA. Adh. K. and V. The project is funded by ADB and other multilateral organisation and the Maldivian Government. 8 contracts have been awareded- 3 consultancies, 2 civil works, 5 goods.
Agency:
Ministry of Environment, Climate Change and Technology
Status Details:
Phase 1 (Installation of 1.5MW solar PV systems in Hulhumale’) has been completed and is in operation. Phase 2 (Installation of 5MW solar PV systems in Hulhumale-Hulhule’Link Road) State Electric Company ltd and Housing Development Corporation coordinating to handover the site to contactor (ENSIS). Phase 3 (Installation of 11 MW Land-based Solar PV at Addu City, Fuvahmulah City, Kulhudhuffushi City, Lh.Hinnavaru, Gdh.Thinadhoo and B.Eydhafushi) bid document is sent to those who was qualified .
Agency:
Ministry of Environment, Climate Change and Technology
Status Details:
Civil works ongoing in HDh islands. Raa and Baa bid evaluation ongoing.
Agency:
Ministry of Environment, Climate Change and Technology
AREISE Project
Pre-tendering
Agency:
Ministry of Environment, Climate Change and Technology
Status Details:
"Contract Terminated due to non-performance of the Contractor To re-Advertise Signed an MOU with Thinadhoo Council to manage the IWMC Construction project amending the drawings as per new IWMC design concept Designing of the IWMC outsourced"
Agency:
Ministry of Environment, Climate Change and Technology
Status Details:
Defect rectifiction ongoing. Punch list works are complete. Final Inspection trip was carried out from 18-20 aug. Currently awaiting site visit report from engineer. Recieved hard copies of asbuilt drawings and OM manual from contractor
Agency:
Ministry of Environment, Climate Change and Technology
Status Details:
"EIA Consultant Bid evaluation done and sent to Bid COmmittee for approval Bid committee decides to re-advertise "
Agency:
Ministry of Environment, Climate Change and Technology
Status Details:
Contractor started laying aqua cells, catch pits in zone 7. All 6 new laborers arrive at Thinadhoo. 85% of aqua cell laying complete in zone 7. Aqua cell laying will be complete in zone 7 next week. HDPE pipes laying and catch pit installation continue in zone 7.
Agency:
Ministry of Environment, Climate Change and Technology
Status Details:
Defect rectification period ongoing. Contractor informed that all the rectification works are now complete. Hard copies of as built drawings and OM manual from contractor received
Agency:
Ministry of Environment, Climate Change and Technology
Agency:
Ministry of Environment, Climate Change and Technology
Agency:
Ministry of Environment, Climate Change and Technology
Status Details:
Inception brief, Existing Environmental Report and feasibility Study Report completed
Agency:
Ministry of Environment, Climate Change and Technology
Status Details:
Inception brief, Existing Environmental Report and feasibility Study Report completed.
Agency:
Ministry of Environment, Climate Change and Technology
Status Details:
Inception brief, Existing Environmental Report and feasibility Study Report completed
Agency:
Ministry of Environment, Climate Change and Technology
Status Details:
Agency:
Ministry of Environment, Climate Change and Technology
Agency:
Ministry of Environment, Climate Change and Technology
Status Details:
Completed
Agency:
Ministry of Environment, Climate Change and Technology
Status Details:
Inception report approved by ministry. Consultant is carrying out land allocation works and is expected to be complete by next week
Agency:
Ministry of Environment, Climate Change and Technology
Agency:
Ministry of Environment, Climate Change and Technology
Agency:
Ministry of Environment, Climate Change and Technology
Agency:
Ministry of Environment, Climate Change and Technology
Agency:
Ministry of Environment, Climate Change and Technology
Agency:
Ministry of Environment, Climate Change and Technology
Agency:
Ministry of Environment, Climate Change and Technology
Agency:
Ministry of Environment, Climate Change and Technology
Agency:
Ministry of Environment, Climate Change and Technology
Status Details:
"Meeting with council held. EMP extended. Design and BOQ works ongoing. will be due on 9th April 2021 Budget transfer requested to MoF. Civil Works Tendered, Bids recieved , Evaluation process ongoing "
Agency:
Ministry of Environment, Climate Change and Technology
Status Details:
"MoU signed with the councils for work . Budget transfered. Council has sent letter regarding how to proceed. Council requests for the provision of WM equipment; letter sent to finance in accordance to the request "
Agency:
Ministry of Environment, Climate Change and Technology
Completed
Agency:
Ministry of Environment, Climate Change and Technology
Agency:
Ministry of Environment, Climate Change and Technology
Agency:
Ministry of Environment, Climate Change and Technology
Agency:
Ministry of Environment, Climate Change and Technology
Status Details:
Final works of Zone 2 RWMS operationalization ongoing. Technical and Financial Feasibility Study for Zone 4&5 RWMS still ongoing. Yet, World Bank clearance recently received for initiating island level insfrastructural works.
Agency:
Ministry of Environment, Climate Change and Technology
Status Details:
EMP approved. Drawings and BOQ works ongoing. Letter sent to MoF requesting approval for to transfer the buget code to thte council for the work to commence.
Agency:
Ministry of Environment, Climate Change and Technology
Status Details:
Land approval works ongoing, getting ready to do the EMP. Other than Sh. Fokaidhoo, contract signed with the remaining 8 islands.
Agency:
Ministry of Environment, Climate Change and Technology
Agency:
Ministry of Environment, Climate Change and Technology
Agency:
Ministry of Environment, Climate Change and Technology
Status Details:
"Waste to Energy module at R. Vandhoo commissioning done and ongoing Monitoring / Troubleshooting Additional procurements for operationalization of Vandhoo being carried out by the remaining project funds"
Agency:
Ministry of Environment, Climate Change and Technology
Status Details:
"Meeting with council held. EMP extended. Design and BOQ works bids recieved; bids evaluated and submited to tender committe"
Agency:
Ministry of Environment, Climate Change and Technology
Status Details:
"MOU signed with the council. Budget transfered EMP Consultant evaluation completed, project award process ongoing . EMP Sent to EPA for reviewing Detailed Engineering Documents completed. Tender documents sent to council "
Agency:
Ministry of Environment, Climate Change and Technology
Status Details:
"MOU signed with the council. Budget transfer requested to MOF EMP Consultancy Awarded Eningeering Documents preparation awarded "
Agency:
Ministry of Environment, Climate Change and Technology
Status Details:
Works finished as per the contract. Council has requested for additional works through the variation option. requested the council to make decision through its bid comittee
Agency:
Ministry of Environment, Climate Change and Technology
Agency:
Ministry of Environment, Climate Change and Technology
Status Details:
All works completed
Agency:
Ministry of Environment, Climate Change and Technology